Skip to content

Merge pull request #145 from shepmaster/ci-refurb #88

Merge pull request #145 from shepmaster/ci-refurb

Merge pull request #145 from shepmaster/ci-refurb #88

Triggered via push June 9, 2025 15:14
Status Failure
Total duration 52s
Artifacts

ci.yml

on: push
Matrix: primary
Matrix: secondary
Matrix: windows
Fit to window
Zoom out
Zoom in

Annotations

7 errors
primary (stable)
Process completed with exit code 101.
secondary (beta)
Process completed with exit code 101.
secondary (nightly)
Process completed with exit code 101.
secondary (nightly)
The strategy configuration was canceled because "secondary.beta" failed
secondary (1.31.0)
The operation was canceled.
secondary (1.31.0)
The strategy configuration was canceled because "secondary.beta" failed
windows (stable)
Process completed with exit code 1.